Skip to main content

ALLIANCE TOOLS

HQ Building Requirements Calculator

HQ 2 – 35

Prerequisite building roadmap required for each Headquarter level (HQ 2 to 35).

HQ Requirements

HQ Building Requirements Calculator

Check which buildings you must upgrade before upgrading your Headquarters (HQ 2 - 35).

Select Target Headquarters (HQ) LevelHQ 30
HQ 2HQ 10HQ 20 (T7)HQ 24 (T8)HQ 27 (T9)HQ 30 (T10)HQ 35

Requirements to Upgrade to HQ 30

Requirement Progress:0%
Strategic Upgrade Tip: The Wall is always required for every HQ level. Secondary buildings usually rotate between Tank/Missile/Aircraft Center, Tech Center, Barracks, and Hospital. Plan your secondary building upgrades well ahead of finishing your HQ upgrade.